Jump to content

Recommended Posts

Posted (edited)

So the not as big as I imagined BBB (Mark has good packing skills) arrived last week.

 

bea2aca4a50a4081171213d7437a1fb0.jpg

 

I've been collecting my supplies while I wait mainly using an excellent thread that I'm sure a lot of you are using.

 

Supply list for your TK build....

 

http://www.whitearmor.net/forum/index.php?/topic/31404-Supply-list-for-your-TK-build%2E%2E%2E%2E

 

Here it is all laid out.

 

704122cbe04cba92559dd591b463336c.jpg

 

7ec1a9295969f325f1049540bacdce98.jpg

 

 

Sent from my iPhone using Tapatalk

Edited by THX1978
  • Like 1
Posted

Right on Tom!!! I'm really excited for you. Be sure to come out to the Armor Party on April 3rd at the same place in Vancouver. Roster up in the ORG Forum if you can make it.

Posted (edited)

Neck seal arrived from Darman. Very nice. Have bought under suit from Amazon. Not sure if it's correct material but it's black so should be ok.

 

d46eaf26d37fa3aac1423f3a613041b2.jpg

 

Still coating helmet with plasti dip. This is going to be a slow build! Difficult to find time with a full time job and kids.

 

Hope to attend local armor party in April. That should speed things up a bit.

 

30e6e810172df9c923e8a78f5e853fd4.jpg

67ba70aee4c6ac695bd0df50bf0d0412.jpg

Edited by THX1978
  • Like 1
Posted

673e0708af39490c3012e48a720228dd.jpg

 

ccb41dc2392e64a602a9bce46657a312.jpg

 

Finished plasti dip spray of front of helmet. Any tips about touching up around eyes? Just some black paint?

 

Gluing inner cover strips to both sides of one half of bicep(x2). You reckon 24 hours is enough to let e600 dry before I move on to glue the biceps together?

 

Wasn't sure if 48 hours is standard or 24 is fine.

  • Like 1
Posted

24 hours is the accepted time to let E6000 set before moving on. The package actually says it sets quicker, but its best not to try to mess with it before 24.

 

You've got a great start - slow and steady will get you there sooner than you know. :)

  • Like 1
Posted (edited)

24 hours is ideal but I've definitely glued one part at night and then glued the other the next afternoon. The longer you wait, the better though. 

Edited by Airborne Trooper
  • 2 weeks later...
Posted (edited)

Biceps done just need outer cover strips. Looking at forearms now.

 

b39c84d6c51f4f5dfb482b17b4aca9b7.jpg

 

Also wanted to get started on my TD but wanted to check measurements are ok.

 

9eb5e5e1655e8977dddca8348a100a1d.jpg

 

CRL says approx length of TD is 7 1/2" is 8" close enough?

Edited by THX1978
Posted (edited)

The pipe is 7" long but with the caps on it's a bit over 8" as it doesn't fit into the recess of the caps. But it's overall length that matters.

 

Here's my plan. Gonna trim 5mm off each cap (by sanding?) then 10mm off the control panel to bring it down to 120mm.

 

That increases the gap by 10mm on each side. So I trim the pipe by 20mm. Brings the overall length to 190mm with caps on. Gaps will be back to about 15mm each side.

 

Sound good?

Edited by THX1978
Posted

Hey Tom, what did you use to plug up the teeth when you painted the inside and how did that work for you?

Posted

I used blu tack which I brought from the uk with me. I'm in Canada now. I got the idea from another thread. It's basically a kind of putty you use to stick posters on the wall. It worked well.

  • Like 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...